Abstract: In this work the method of reception of aprioristic top and bottom estimations of time expenses for realization of distributed brute force attack in heterogeneous systems using time wave systems are considered. Time estimations for various variants of construction of heterogeneous systems are shown.
Keywords: distributed brute force attack, time-consuming estimate
Authors and copyright holders:
—
For citation:
Treschev I. A. Evaluation of time-cost for implementation of distributed brute force attack in heterogeneous systems using time wave systems. Doklady Tomskogo gosudarstvennogo universiteta sistem upravleniya i radioelektroniki, 2012, no. 1(25), – p. 2. pp. 141–147.
Executive Secretary of the Editor’s Office
Editor’s Office: 40 Lenina Prospect, Tomsk, 634050, Russia
Phone / Fax: + 7 (3822) 701-582
Viktor N. Maslennikov
Executive Secretary of the Editor’s Office
Editor’s Office: 40 Lenina Prospect, Tomsk, 634050, Russia
Phone / Fax: + 7 (3822) 51-21-21 / 51-43-02